Applications tied to the site
Partial coverage8 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
8 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
4% of nearby decided applications were refused. The site check found 615 decisions within 5 km, 8 exact-site or onsite candidate records, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
8 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
8 matched1 of 2 layers are loaded for Cork County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matched2 current citations from the Cork County Council development plan, each with section, page and source URL.
2 matched3 of 4 layers are loaded for Cork County Council and were intersected with the site; flood is not loaded and no conclusion is drawn for it.
3 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Citations are current-dated and carry policy name, section, page and source URL from the Cork County Council development plan.
2 matchedOpen preview
Open preview
Construction of a calf house and associated works
Installation of a cattle underpass, soiled water tank and associated works.
Permission for retention of (1) Existing dwelling house as constructed, (2) Existing 2 No. vehicular entrances as constructed, (3) Modified attic space as constructed, and permission to construct new domestic garage and all associated site works.
3.43km of grid connection infrastructure on the public road to connect the approved Ballyspillane West Solar Farm (Planning Reference 175498) to the Midleton 110kV ESB Substation, comprising the laying of underground electricity cables and associated infrastructure and horizontal directional drilling. The proposed development will also include a customer substation which is proposed to relocate the substation consented within the associated solar farm development (PA Ref: 175498). The ESBN MV customer substation is to be located near the site entrance to the east, to align with the connection route to the national grid. Based on new ESB Networks design standards, two options have been considered for the design of the proposed substation. A Natura Impact Statement will be submitted to the Planning Authority with the application.
(a) Retention of dwelling previously permitted to be demolished under Pl.Reg. No. 11/05001 and (b) permission for use of said dwelling as a granny flat ancillary to the main dwelling.
The importation of soil and stone for the raising of an agricultural field in order to improve the agricultural output of the field and the construction of a temporary new haul road. A Natura Impact Statement (NIS) has been prepared and submitted to the authority with this application.
The brief summarizes the pattern across all 615 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 23/4162The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief