Applications tied to the site
Partial coverage10 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
10 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
12% of nearby decided applications were refused. The site check found 443 decisions within 5 km, 10 exact-site or onsite candidate records, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
10 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
10 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
The construction of 3 no. dwelling houses comprising of 2 no. 3-bedroom townhouses and 1 no. 2-bedroom townhouse, and a two-storey creche with ancillary bicycle and bin stores and all other ancillary site development works. The proposed dwelling houses to the west of the site will replace a creche facility previously permitted by reference 08/7515 (as extended by reference 14/4105 & 18/6460) with vehicular access to the proposed dwelling houses being provided via the existing estate entrance from Convent Hill (L-2011) to the north. The proposed creche facility to the east of the site is a change of plan from the creche previously permitted by reference 19/5749 (as amended be reference 22/4960) with vehicular access to the proposed creche being provided via a separate estate entrance permitted by reference 19/5749 (as amended by reference 22/4960), also from Convent Hill
The replacement of two existing 10m high support poles carrying associated antennae for a 24 metre high free standing communications structure with its associated antennae, communication dish, ground equipment and all associated site development works within an existing fenced compound. The development will continue to form part of existing 3G and 4G Broadband network
Construction of 183m of 2.4m high Palisade Fencing around the East, South and North perimeter of the site and the installation of one manually operated lockable gate suited to match the perimeter fencing.
Full planning permission to construct 25 no. new dwelling houses and all ancillary site development works at site known as 'Tanners Field' at lands at Coolfadda, Bandon, Co. Cork. The proposed development consists of the construction of 10 no. 3 bedroom 2-storey townhouses, 2 no. 3 bedroom 2-storey semi-detached houses and 13 no. 2 bedroom 2-storey townhouses. The proposed development is a change of plans from that previously permitted by planning reference 08/7515 (as extended by reference 14/4105 & 18/6460) and will consist of an increase of 9 no. residential units. Vehicular and pedestrian access to the proposed development will be provided via the existing estate entrance from Dunmanway Road (R586) to the south of the proposed site. The proposed access road serving the new units will connect to the permitted residential development to the east of the proposed site, known as 'The Tannery', which is accessed by permitted entrance from Convent Hill (L-2011). Provision is also made for a previously permitted pedestrian link to the exiting northern part of the estate.
Construction of 9 no. dwelling houses consisting of 8 no. 3 bedroom semi-detached dwelling houses and 1 no. 3 bedroom detached dwelling house and all ancillary site development works. The proposed development is a change of plan from that previously permitted under Cork County Council Planning reference 08/7515 [as extended under Cork County Council Planning Reference 14/4105 & 18/6460] and will replace 10 no. permitted dwelling houses. Access to the proposed development will be provided via the junction and internal road network from Convent Hill (L-2011) to the north as permitted under Cork County Council Planning Reference 08/7515 [as extended under Cork County Council Planning References 14/4105 & 18/6460].
Residential development of 80 no. two and three storey dwellings, construction of 2 no. entrances and associated site works to include multi-use games area, neighbourhood play areas, pumphouse, attenuation tank, new surface water outfall to Bandon River and associated site works and services and site development works for future childcare facility, extension of duration to permission granted under Planning Ref. No. 08/7515 and extended under Planning Ref. No. 14/4105.
The brief summarizes the pattern across all 443 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 23/4231The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief