Applications tied to the site
Partial coverage8 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
8 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
8% of nearby decided applications were refused. The site check found 488 decisions within 5 km, 8 exact-site or onsite candidate records, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
8 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
8 matched1 of 2 layers are loaded for Cork County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matched2 current citations from the Cork County Council development plan, each with section, page and source URL.
2 matched3 of 4 layers are loaded for Cork County Council and were intersected with the site; flood is not loaded and no conclusion is drawn for it.
3 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Citations are current-dated and carry policy name, section, page and source URL from the Cork County Council development plan.
2 matchedOpen preview
Open preview
The retention of the existing childcare facility which consists of 2 no. childcare buildings, a covered playroom, 2 no. external eco toilets, an outdoor classroom, an astro-turf play area and all ancillary siteworks. Futhermore planning permission is also sought to construct the following; 1) proposed covered play area, 2)Proposed sensory room, 3) widening of existing site entrance, 4) all ancillary site works.
The construction of a dwelling house, site entrance, wastewater treatment system and all associated works
Construction of single storey dwelling, garage, entrances, effluent treatment system and associated site works.
Construct a new dwelling house.
Construction of a 2 storey dwellinghouse, a single storey detached garage, installation of a septic tank and percolation area, a new entrance from public road and all associated site works.
Permission for the construction of a dwelling house with an attached carport, a waste water treatment system & all other associated site works. Access to the proposed site is via existing vehicular entrance from the public road & a right-of-way along an existing private access laneway as previously granted under planning reference 18/5554.
The brief summarizes the pattern across all 488 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 23/4241The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief