Applications tied to the site
Partial coverage7 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
7 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
6% of nearby decided applications were refused. The site check found 106 decisions within 5 km, 7 exact-site or onsite candidate records, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
7 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
7 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
The construction of a new bunded concrete apron for the open storage of crashed vehicles with associated new underground grit and hydrocarbon interceptor feeding to underground soakaway and all associated site works.
Planning permission to (a) construct a new dwelling house, (b) modify an existing entrance, (c) install a new bored well and (d) install a new septic tank, percolation area and all associated site works.
1) changes to the facades and roof structure of the existing dwelling; 2) construction of a new two storey extension: 3) construction of a new wastewater treatment unit and percolation area; 4) including all associated site works: all to the existing two storey detached house
Permission for retention for slatted unit shed extension to existing farm buildings as constructed on site and all associated site works
Planning permission to construct a new dwelling house
Permission for 1) decommissioning of the existing septic tank and replacement with a new waste water treatment system, 2) relocation of the existing bored well to facilitate the waste water treatment system and decommissioning of the existing well, 3) alterations to the existing site entrance and road boundary fence.
The brief summarizes the pattern across all 106 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 23/4432The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief