Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
6% of nearby decided applications were refused. The site check found 436 decisions within 5 km, 2 exact-site or onsite candidate records, and 3 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
3 structured nearby appeal records.
3 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
To retain existing residential front porch along with rear & side residential extension onto existing dwelling along with all associated site works and services
(i) The construction of 17 number dwellings; 4 number two storey semi-detached dwellings; 3 number two storey terraced dwellings and 10 number two & three storey detached dwellings. Each dwelling is served by a rear garden private amenity space, on site and or street side car parking. House no's 53,55,57,59 to have 2 house type options available, type 5A & 5 B for house no's 53,57 & 59 and type 5C & 5E for house no. 55. (ii)The construction of two number single storey detached garages at house no's 45 & 59. (iii) Provision of public open space to serve the development (shared with the existing Ard Caladh estate), street lighting, internal roadways with connection to Upper Cork Hill via the existing road network within the completed Ard Caladh and Cnoc Aoibhinn & Gort Aoibhinn estates, footpaths, foul and SUD's surface drainage, landscaping & boundary treatments and all ancillary infrastructural and engineering works necessary to facilitate the development.
Construct corner window on south east and north east elevation, sliding glass door on south east elevation, including alteration to floor layouts to existing dwellinghouse.
Retention of rooflights to dwellinghouse
Permission to provide two glamping pods for short term letting, to relocate existing steel storage container for ancillary storage use for the new development, to remove the two remaining steel storage containers from the development site along with all associated site works and services.
(i) Demolition of existing single storey extensions and outbuildings to the rear and side of existing two storey dwelling, (ii) The construction of a single storey extension to the side of the existing two storey dwelling, (iii) Alterations to existing elevations, (iv) New internal access driveway and all ancillary site works
The brief summarizes the pattern across all 436 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 23/4460The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief