Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
6% of nearby decided applications were refused. The site check found 51 decisions within 5 km, 1 exact-site or onsite candidate record, and 1 structured appeal.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
1 structured nearby appeal record.
1 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
We, Inchamore Wind Designated Activity Company, intend to apply for permission for a ten-year planning permission for a renewable energy development. The entirety of the renewable energy development constitutes the provision of a five-turbine wind farm and all associated works on land in both Counties Cork and Kerry. The development for will consist of: 1) a wind farm with an operational lifespan of 35 years (from date of commissioning of the development), 2) the construction of five turbines with an overall ground to blade tip height ranging from 177m to 185m inclusive; a rotor diameter ranging of 149m to 155m inclusive; and a hub height ranging from 102.5m to 110.5m inclusive, 3)construction of permanent turbine hardstands and turbine foundations, 4) Construction of one temporary construction compound with associated temporary site offices, parking areas and security fencing. 5) installation of a (35-year life cycle) meteorological mast with a height of 110m and a 4m lightning pole on top, such that the overall structure will be 114m, 6) development of an on-site borrow pit, 7) construction of a new permanent internal site access roads to include passing bays and all associated drainage infrastructure. 8) development of a permanent internal site drainage network and sediment control systems. 9) construction of a permanent 38 kV electrical substation including a control building with welfare facilities, all associated electrical plant and equipment, parking security fencing and gates, all associated underground cabling, wastewater holding tank, and all ancillary structures and works, 10) all associated underground electrical and communications cabling connecting the wind turbines to the on-site wind farm substation, 11) ancillary forestry felling to facilitate construction of the development, 12) all associated site development works including berms, landscaping, and soil excavation. Advisory note: A planning application is being lodged with Kerry County Council in relation to the elements of the project that are within the townland of Derryreag (Dhoire Aimhréidh) Co.Kerry, including the upgrade of the site entrance off the N22 and permanent forest track upgrade works. The planning application will be accompanied by an Environmental Impact Assessment Report (EIAR) and Natura Impact Statement (NIS). Tá sé beartaithe againne, inchamore Wind Cuideachta Ghníomhaíochta Ainmnithe, iarratas adhéanamh ar Chead maidir le cead pleanála deich mbliana d’fhorbair
The erection of a temporary 100m high lattice type meteorological mast for a period of 5 years. The structure will be fixed to ground anchors by stay wires and will include instruments for measuring local climate conditions and all ancillary works.
Erecting a 30m high latticework telecommunications structure together with antennas, dishes and associated telecommunications equipment enclosed by security fencing and all associated site works with an extension to the existing access track.
THE DEVELOPMENT IN COUNTY KERRY FORMS PART OF A RENEWABLE ENERGY DEVELOPMENT COMPRISING A FIVE-TURBINE WIND FARM AND ALL ASSOCIATED WORKS ON LANDS IN BOTH COUNTIES CORK AND KERRY. THE DEVELOPMENT IN COUNTY KERRY WILL CONSIST OF UPGRADE OF EXISTING FOREST ACCESS ROADS TO INCLUDE PASSING BAYS AND ALL ASSOCIATED DRAINAGE INFRASTRUCTURE, WORKS AT THE ENTRANCE TO AN EXISTING FOREST ROAD ACCESSED OFF THE N22 TO INCLUDE LOCALISED WIDENING OF THE FOREST ROAD AND CREATION OF A SPLAYED ENTRANCE, REMOVAL OF EXISTING VEGETATION FOR VISIBILITY SPLAYS AND REMOVAL OF STREET FURNITURE. ADVISORY NOTE: A PLANNING APPLICATION IS BEING LODGED WITH CORK COUNTY COUNICL IN RELATION TO THE ELEMENTS IN THE PROJECT THAT ARE WITHIN THE TOWNLANDS OF INCHAMORE, MILLEENY AND DERREENALING COUNTY CORK. THIS DEVELOPMENT INCLUDES FIVE WIND TURBINES, UNDERGROUND CABLING, SITE ACCESS ROADS, A BORROW PIT, A TEMPORARY SITE COMPOUND, A 38KV SUBSTATION AND ALL ASSOCIATED WORKS FOR WHICH A TEN-YEAR PLANNING PERMISSION IS BEING SOUGHT. THE PLANNING APPLICATION IS ACCOMPANIED BY AN ENVIRONMENTAL IMPACT ASSESSMENT REPORT (EIAR) AND NATURA IMPACT STATEMENT (NIS)
The development will consist of a soil recovery facility for greenfield soil and stones with smaller quantities of concrete, bricks, tiles, and ceramics (the concrete, bricks, tiles, and ceramics will be used for internal road building). The proposed development will involve the remediation by infilling of existing agricultural land which was historically excavated in the past. The site comprises 1.58 hectares, of which 1.09ha will be fill area. The proposed development incorporates improving the existing site entrance, and all ancillary works associated with the development
The construction of a new dwelling house, domestic garage and associated site works.
The brief summarizes the pattern across all 51 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 23/5145The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief