Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
7% of nearby decided applications were refused. The site check found 597 decisions within 5 km, 1 exact-site or onsite candidate record, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
10 year planning permission for a solar farm with a total area of circa 126 hectares comprising of solar panels on ground mounted frames with a surface area of circa 532,000m2, 21 no. single storey electrical inverter/transformer stations, 5 no. single storey energy storage modules, 3 no. single storey spare parts containers, 12 no. ring main units, 5 no. weather stations, underground electrical ducting and cabling within the development site, private lands and within the R630, L7657, L7658 and L7659 public roads to connect to solar farm field parcels, security fencing, CCTV, access tracks, 1 no. drain deck crossing, temporary construction compounds, landscaping and all associated ancillary development works. Construction and operational access will be via entrances from L7657, L7658 and L7659. The operational life span of the solar farm will be 40 years and planning permission is requested for its duration. A Natura Impact Statement (NIS) has been prepared and submitted to the planning authority with the application.
The construction of a single storey detached dwelling including a new wastewater treatment unit and percolation area, a new access road to the proposed site, and all associated site works and landscaping
4 no. dwellings and associated site services.
The construction of the following; 1) a new single storey extension to the south elevation; 2) alterations to the existing elevations to block up a first floor corner window and also add new first floor windows; 3) a new first floor glazed link with access to the northern elevated garden; 4) alterations to the existing sunroom roof to allow for a perimeter parapet; all to the existing two storey detached dwelling and including all associated site works.
6 no. number dwellings, new vehicular entrance to serve the proposed dwellings and any future development and all associated site services.
Construction of a dwelling (change of house design, layout and revised site boundaries from that permitted under PL. Reg. No 17/7269) and all associated site works.
The brief summarizes the pattern across all 597 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 23/5270The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief