Applications tied to the site
Partial coverage7 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
7 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
4% of nearby decided applications were refused. The site check found 257 decisions within 5 km, 7 exact-site or onsite candidate records, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
7 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
7 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Dormer dwelling house, waste water treatment system, alterations to entrance and all associated works.
Dwelling house, detached domestic garage, entrance and all associated site works including waste water treatment system and soil polishing filter. Extension of duration of permission granted under planning reference: 15/05144.
To (i) Construct a new easy feed slatted livestock unit. Proposed livestock unit to incorporate associated underground slurry storage tanks with 4 external agitation points & ancillary external concrete (ii) Erect a meal silo. The above development to be carried out with all associated ancillary site works.
Permission to construct a single storey extension to side of existing dwelling and ancillary works.
The construction of a dwelling, domestic garage, a new site entrance and all associated site works including a new waste water treatment system.
To construct a two-storey dwelling, domestic garage, entrance and a secondary wastewater treatment system.
The brief summarizes the pattern across all 257 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 23/5352The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief