Applications tied to the site
Partial coverage16 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
16 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
9% of nearby decided applications were refused. The site check found 645 decisions within 5 km, 16 exact-site or onsite candidate records, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
16 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
16 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Construction of single storey office/gym for domestic use and all ancillary site works.
Construction of a new two storey detached dwelling, new site entrance with vehicular access from public road, domestic wastewater treatment system and all ancillary site development works.
Construction of a new split level dwelling, new site entrance with vehicular access from public road, domestic wastewater treatment system and all ancillary site development works.
Erection of a two storey four bedroomed dwelling and associated site ancillary works. Extension of Duration of Planning permission ref no. 12/5406.
The construction of a 30 no bedroom, three-storey extension to the existing Radisson Blu Hotel & Spa. The proposed development makes provision for internal alterations to the existing hotel to accommodate the proposed extension, including the omission of 2 no. existing hotel rooms at upper floors, omission of meeting room/administrative space at ground floor level and all ancillary works including rooftop plant. The proposed development consists of works within the curtilage of a Protected Structure
Retention of licensed Bar/Pizza oven Structure.
The brief summarizes the pattern across all 645 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 23/5491The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief