Applications tied to the site
Partial coverage6 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
6 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
6% of nearby decided applications were refused. The site check found 735 decisions within 5 km, 6 exact-site or onsite candidate records, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
6 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
6 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Permission to re-develop and re-purpose, existing farm and stable buildings together with overhead grain storage lofts and forge building, all centered around original stable/farm yard. The works will comprise of; 1) development of farm shop and coffee shop together with food-preparation course, kitchen facility and associated storage, 2) development of equine lecture and training area, together with farm/equine museum, 3) administration and reception area, 4) construction of 2 no. 2 bed-apartments with access stairs, to loft areas of existing buildings, 5) 5 no. craft manufacturing and display units within existing stables, 6) re-modelling of existing forge building for forge and farm equipment display, 7) all associated toilet and sanitary accommodation, together with installation of commercial effluent treatment plant and infiltration area with all associated development works, 8) construction of new vehicular entrance from public road way and provision of gravel car parking area.
To convert original stone-built farm-building to 2 No. holiday apartments, for short-term letting, including construction of new stairwell to rear of main block as well as all associated site development works.
Permission for the retention of sundry changes to layout and elevations of existing farmyard accommodation comprising two (2no.) self-contained units, including such works as (1) retention of new window and door units and fenestration, (2) retention of new profiled metal sheet roofing (3) retention of new effluent treatment plant replacing previous septic tank as well as retention of all internal alterations and sub-divisions so as to upgrade the building for seasonal staff accommodation as well as short-term letting.
Permission to construct three portal framed, commercial units, for storage, retail and associated office use together with associated car-parking, access road with, access through new site entrance permitted under planning reg no. 23/5572 and effluent connection to waste water treatment unit permitted under planning reg no. 23/5572.
Permission for change of use from existing An Post sorting office (units 17-19) to light industrial, storage and company staff training.
Two storey dwelling-house and domestic store, accessed through re-modelled existing farm-yard entrance, new access driveway, new domestic effluent treatment plant and percolation area, together with all associated site development works.
The brief summarizes the pattern across all 735 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 23/5572The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief