Applications tied to the site
Partial coverage3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
6% of nearby decided applications were refused. The site check found 952 decisions within 5 km, 3 exact-site or onsite candidate records, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
A 10 MW solar farm comprising approximately 44,400 photovoltaic panels on ground mounted frames within a site area of 25.8 hectares, 4 no. single storey inverter/transformer stations, 2 no. single storey delivery stations, security fencing, CCTV, and all associated ancillary development works. Extension of Duration to Permission granted under Pl.Reg.No. 17/6351.
Modification to the solar farm permitted under planning reg no. 17/6351. The modification consist of changes to the dimensions of the permitted photovoltaic panels, replacement of the 4 transformers stations with 4 smaller stations and 1 smaller storage unit, replacement of the 2 delivery stations with one larger delivery station, change to the permitted fencing type associated layout changes. All modifications are within the boundary of the permitted development
A 10 MW solar farm comprising approximately 44,400 photovoltaic panels on ground mounted frames within a site area of 25.8 hectares, 4 no. single storey inverter/transformer stations, 2 no. single storey delivery stations, security fencing, CCTV, and all associated ancillary development works.
To retain dwellinghouse (change of plan to that granted permission under Planning Reg. No. 06/8847).
Permission for demolition of two bay windows at ground level to south east façade of the existing dwelling and construction of a single storey porch and conservatory to the south east façade of the existing dwelling.
A new vehicular entrance off Church Road (R613) to access the permitted Solar Farm Development (Planning Ref. No. 17/6351) including all ancillary works.
The brief summarizes the pattern across all 952 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 23/5671The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief