Applications tied to the site
Partial coverage7 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
7 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
7% of nearby decided applications were refused. The site check found 1,005 decisions within 5 km, 7 exact-site or onsite candidate records, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
7 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
7 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
The development consists of the retention of a temporary 290-space car park, with associated bus turning and set down area, lighting and fencing, The car park will operate for a period of up to 5 years.
The construction of a temporary 290-space car park, with associated bus turning and set-down area, and site lighting. The car park will operate for a period of up to 24 months.
To erect 145m2 of photovoltaic panels on the roof of the existing office with all associates site works.
Retention of alterations to existing commercial unit as follows: i) extension to existing office space at ground and first floor levels (floor area: 139sq.m) via partial change of use of existing warehouse space to office space; ii) provision of ancillary office space to warehouse (floor area: 32sq.m) via partial change of use of existing warehouse space to office space; iii) elevational alterations, including addition of windows/doors at ground and first floor levels to the front (western) elevation and alteration of ground and first floor windows and doors to the side (northern) elevation.
Demolition of existing dwelling house, and construction of new dwelling house with waste water treatment system and ancillary site works.
Permission for the retention of (a) ground floor extensions and external alterations to the front, rear and side elevations of our existing bungalow and (b) garage structure attached to the rear of the dwellinghouse, together with all associated site works.
The brief summarizes the pattern across all 1,005 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 23/5826The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief