Applications tied to the site
Partial coverage6 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
6 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
9% of nearby decided applications were refused. The site check found 686 decisions within 5 km, 6 exact-site or onsite candidate records, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
6 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
6 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
The Development will consist of a new waste water treatment area. Works will include the construction of a standalone single storey roofed tankage structure, a two-storey dewatering/sludge building, a concrete slab area, access road, 3 no. vehicle parking bays and associated ground level mounted equipment and storage area. This application is for an amendment to the WWT area previously approved under reference no. 22/4839. The proposed development is on an existing manufacturing site to which the Major Accidents Directive applies, and to which an Industrial Emissions Licence and an Integrated Pollution Control Licence that are regulated by the Environmental Protection Agency (EPA) applies.
Permission for the construction of a single storey ESB switch room building, single vehicle park space, pedestrian paths and ramps. The proposed development is for a new build on an existing manufacturing establishment site to which the Major Accidents Directive applies. The proposed development site is subject to the provisions of an EPA-Industrial Emissions Directive (IE) Licence
The replacement of approximately 206m of existing 2.4m high chainlink perimeter fencing and associated access/emergency gates with new 2.4m high green palisade security fencing/gates, and all associated site works.
Permission for alterations and revisions to the previously approved planning reference number 22/4839. The proposed changes include a reduction in the size of the T7 building and an expansion of the pump house footprint (total 5.6m2 increase in total floor area). Modifications to the permanent bridge are also proposed, involving adjustments to its external materials and dimensions. Site-wide landscaping updates are planned, along with the installation of high-level signage on the IC4 production building. Minor adjustments to the type, size and placement of doors and windows are proposed for the IC4 production building, central utility building, drum store and foam deluge building. The application also includes the relocation of the southeast gate and detailing of the cycle route. Finally, alterations to plant, machinery, and tanks to the IC4 production building, yard area and fire water tank areas are part of this proposal. The proposed development is located on an existing manufacturing site which the Major Accidents Directive applies. The site is also subject to both an Industrial Emissions License and an Integrated Pollution Control License, regulated by the environmental Protection Agency (EPA). A Natura Impact Statement and Appropriate Assessment Screening Report is submitted to the Planning Authority with this Application.
To create a temporary surface treatment for the purpose of commercial storage of articulated truck trailers, a new vehicular entrance, palisade boundary fencing and associated site works. A Natura Impact Statement will be submitted to the Planning Authority with the application.
Create a temporary surface treatment for the purpose of commercial storage of articulated truck trailers, a new vehicular entrance, palisade boundary fencing and associated site works.
The brief summarizes the pattern across all 686 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 23/5983The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief