Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
4% of nearby decided applications were refused. The site check found 128 decisions within 5 km, 1 exact-site or onsite candidate record, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Retention for the construction of a single storey forklift charging building and all ancillary site development works. The proposed development is for modifications to an establishment to which the Major Accident Directive applies.
The expansion of the existing maturation warehouse facility and all ancillary site development works. The proposed development includes 60 no. maturation warehouses, which will be constructed in 30 no. blocks of 2 warehouses and 3 no. ESB substations. Ancillary site development works include landscaping, tree felling, berming, fencing, settlement basin and a surface water attenuation pond. Access to the expanded maturation facility will be via the existing entrance and access road from the L3800. Emergency access will be provided via the existing gated entrance from the L7693. An Environmental Impact Assessment Report (EIAR) has been prepared and will be submitted to the Planning Authority with the application. The proposed development is for modifications to an establishment to which the Major Accident Directive applies.
Permission for construction of a dwelling, waste water treatment unit, percolation area, well and associated site works
Construction of a dwelling, garage, septic tank, percolation area, well and associated site works.
Construction of an animal house incorporating stables, central passage, seepage tank and all associated works.
Construction of a floodlit all weather arena for the exercising of horses and all associated works
The brief summarizes the pattern across all 128 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 23/6000The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief