Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
5% of nearby decided applications were refused. The site check found 671 decisions within 5 km, 1 exact-site or onsite candidate record, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Permission to retain the following a) a single storey extension to dwelling on north-eastern side of original cottage, and b) a dormer type extension to dwelling on the north-western side of original cottage.
Construct a two storey dwellinghouse, domestic garage, new vehicular entrance, wastewater treatment system and percolation area and all associated site works
Construct a two-storey dwelling house, domestic garage, new vehicular entrance, wastewater treatment system and percolation area and all associated site works
Demolish a haybarn and construction of a grainstore building with straw storage and ancillary works
Alterations to the existing Midleton 110kV station to include a single storey extension on the northern side of the existing control building and the extension of the existing compound palisade fence to the north of the site.
Development of grid system services facility within a total site area of up to 0.76 hectares, to include 1 no. single storey electrical substation building, 1 no. customer switcher gear, electrical inverter/transformer station modules, containerised battery storage modules on concrete support structures, heating, ventilation and air conditioning units (HVAC units), access tracks and new site entrance, associated electrical cabling and ducting, security gates, perimeter security fencing, CCTV security monitoring system, animal fencing, earth bund and landscaping works and all associated ancillary infrastructure on land.
The brief summarizes the pattern across all 671 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 23/6084The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief