Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
9% of nearby decided applications were refused. The site check found 444 decisions within 5 km, 1 exact-site or onsite candidate record, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Permission for two-storey dwelling and domestic garage together with all associated services and site development works.
Construction of 30 no. dwelling houses and all associated site works, including vehicular access, parking, footpaths, drainage, landscaping and amenity areas. Extension of Duration to Permission granted under Planning Ref. No. 17/7117 and extended under 23/6237
Construction of 30 no. dwelling houses and all associated site works, including vehicular access, parking, footpaths, drainage, landscaping and amenity areas. Extension of Duration to Permission granted under Planning Ref. No. 17/7117
Construction of 30 no. dwelling houses and all associated site works, including vehicular access, parking, footpaths, drainage, landscaping and amenity areas.
1) the conversion of an existing attic to domestic habitable accommodation; 2) the addition of new velux windows and a dormer window to the existing roof for the new attic; 3) a new window to the gable wall; all to the existing two storey semi-detached dwelling.
To construct dormer bungalow with septic tank and percolation area, access road, site entrance from public road and all associated site development works.
The brief summarizes the pattern across all 444 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 23/6236The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief