Applications tied to the site
Partial coverage9 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
9 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
3% of nearby decided applications were refused. The site check found 283 decisions within 5 km, 9 exact-site or onsite candidate records, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
9 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
9 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Permission to construct new two storey and single storey extension at rear of dwelling house, extend first floor over existing single storey extension at rear (north east facing), new single storey extension at side (south east facing) and all associated site works
Construction of a dwelling and carrying out of all associated site works.
Alterations and construction of single storey extension to the rear of dwelling and associated siteworks.
To install a secondary wastewater treatment system and a tertiary filter and all associated site works.
To construct a dormer style dwelling, garage, upgrade existing entrance and ancillary works.
Permission for the construction of 43 no. dwelling houses and all ancillary site development works. The proposed development consists of the construction of 5 no. 4 bedroom detached dwelling houses, 4 no. 4 bedroom semi-detached dwelling houses, 26 no. 3 bedroom semi-detached dwelling houses, 4 no. 3 bedroom townhouses and 4 no. 2 bedroom townhouses. Ancillary site works include landscaping, public open spaces and servicing proposals. Access to the proposed development will be provided via the existing estate entrance and internal road network of the Sliabh Álainn residential development.
The brief summarizes the pattern across all 283 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 23/6362The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief