Applications tied to the site
Partial coverage14 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
14 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
9% of nearby decided applications were refused. The site check found 333 decisions within 5 km, 14 exact-site or onsite candidate records, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
14 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
14 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Permission for the following works to existing dwelling: (i) construction of ground floor extension, (ii) construction of first floor extension, (iii) raised decking area to rear, and (iv) all associated site works
Permission for demolition of a section of the existing timber panel fence with anti-climb guarding and construction of a 3m high anti-ligature, anti-climb fence
Permission for Retention of two portacabins for staff changing facilities
The construction of new covered ambulance set down bays, new entrance into the existing hospital, minor internal reconfiguration works and the demolition of existing external ramp, along with new ambulance parking, accessible parking and all associated site development works
Construction of a single storey extension circa 70SQM to the northern elevation of existing laboratory together with all associated site development works
Construction of a single storey Endoscopy Unit and the construction of a single storey extension to the existing hospital to provide 16 no. beds for a Stroke Rehabilitation Unit and all associated site development works including a link from the proposed Endoscopy Unit to the existing hospital, alterations to the road layout and parking, upgrading of landscaping and amenity areas associated with the proposed Endoscopy Unit and Stroke Rehabilitation Unit and permission for the construction of an overflow carpark to the north of the site and associated ancillary works
The brief summarizes the pattern across all 333 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 23/640The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief