Applications tied to the site
Partial coverage3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
9% of nearby decided applications were refused. The site check found 253 decisions within 5 km, 3 exact-site or onsite candidate records, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matched1 of 2 layers are loaded for Cork County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matched2 current citations from the Cork County Council development plan, each with section, page and source URL.
2 matched3 of 4 layers are loaded for Cork County Council and were intersected with the site; flood is not loaded and no conclusion is drawn for it.
3 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Citations are current-dated and carry policy name, section, page and source URL from the Cork County Council development plan.
2 matchedOpen preview
Open preview
Permission for the closing the existing site entrance and the construction of a new site entrance to the aforementioned property
Change of use of existing farm outbuilding into single dwelling. Construction of two storey extension and canopy to the building. Alterations to existing building, reroofing, new windows and rooflights. Construction of new landscaping and the installation of a wastewater treatment system for the dwelling.
Construction of a two storey dwelling house wastewater treatment system and all associated site works
Permission for the following: 1. Demolition of disused calf housing, 2. Retention of existing agricultural building to include cubicle and straw bedded livestock housing along with slatted slurry storage tanks, 3. Construction of a) Agricultural building to include straw bedded calf housing, extension to existing milking parlour, crush and roofed waiting yard, b) Agricultural building for the storage of agricultural machinery and dry goods, along with unroofed dungstead, c) Soiled water tank along with associated site works. - Extension of Duration to Permission granted under Planning Ref. No. 16/250.
Construction of a dwelling house, part bungalow, part two storey and garage, conventional septic tank and percolation area and all associated site works
Permission for Retention of side and rear extensions, modifications to roof and elevations, all to existing dwelling and all associated site works.
The brief summarizes the pattern across all 253 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 23/6401The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief