Applications tied to the site
Partial coverage3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
12% of nearby decided applications were refused. The site check found 460 decisions within 5 km, 3 exact-site or onsite candidate records, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Permission for the construction of a residential development consisting of 77 no. dwelling houses and a single storey creche facility with ancillary surface car park, bicycle parking racks, bin stores and all ancillary development works. The proposed development consists of the construction of 7 no. 4 bedroom detached/semi-detached dwelling houses, 38 no. 3 bedroom semi-detached/townhouse units and 32 no. 2 bedroom townhouse units. Vehicular and pedestrian access to the proposed development will be provided from the Cork Road (L-2040) to the west with a pedestrian link also provided from the Ard an Chuilinn residential development to the northeast of the site. The proposed development provides for undergrounding of a section of the Bandon-Ballincollig-Timoleague 38kV overhead line, including associated provision of a steel lattice mast structure. Ancillary site development works include landscaping and water, wastewater and surface water servicing proposals.
Permission for 8 no. 3-bedroom semi-detached dwelling houses and all ancillary site works. The proposed development is a change of house type from that permitted under An Bord Pleanala 320810-24 and Cork County Council Planning Reference 24/5216. Access to the proposed development will be provided via the Blossomhill primary estate road as previously permitted.
Construction of 73 no. dwelling houses and all ancillary site works. The proposed residential development involves the construction of 20 no. 4 bedroom detached dwelling houses, 18 no. 4 bedroom semi-detached dwelling houses, 28 no. 3 bedroom semi-detached dwelling houses, 7 no. 2/3 bedroom townhouses and of a new junction on the Cork Road. Access to the proposed development will be via a new junction from the Cork Road.
Permission for the construction of 95 no. residential units and all associated site development works including footpaths, car and bicycle parking, drainage, bicycle and bin stores, lighting and landscaping/amenity. Access will be provided via the access road onto the Cork Road permitted under reference 21/4059.
The construction of a single storey extension to the rear of existing dormer dwelling and all associated site works.
Alterations and extensions to the existing dwelling, including the construction of a granny flat to the western elevation of the dwelling, incorporating the ground floor bedroom of the existing dwelling, along with all associated site works.
The brief summarizes the pattern across all 460 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 23/6540The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief