Executive snapshot
10% of nearby decided applications were refused. The site check found 179 decisions within 5 km, 4 exact-site or onsite candidate records, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
4 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
4 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Permission for: (i) retention of partial infill of former lobster pond, (ii) completion of in-fill of pond, (iii) change of use of existing structure to a quay, construction of extension to same to incude improvement works to existing structure, (iv) construction of slipway, and (v) all associated site works - all for specific community usage, private usage, aquaculture & inshore fishing usage as well as leisure activities. A Natura Impact Statement (NIS) has been prepared and will be submitted with the application. The Natura Impact Statement (NIS) will be available for inspection or purchase at a fee not exceeding the reasonable cost of making a copy.
Permission for:: (i) retention of partial infill of former lobster pond, (ii) completion of in-fill of pond, (iii) construciton of rock armour sea-defence buttress wall, at sea side of existing long-standing concrete structure, (iv) protection of same, (v) completion of infill to remainder of "lobster pond", and (vi) for all associated site works. A Natura Impact Statement (NIS) has been prepared and will be submitted with the application. The Natura Impact Statement (NIS) will be available for inspection or purchase at a fee not exceeding the reasonable cost of making a copy
Demolish existing bungalow and domestic garage, and permission to construct a replacement dwellinghouse and domestic garage, install a wastewater treatment plant and to undertake all associated site works
(i) Demolition of existing commercial shed, (ii) Construction of new dwelling house, (iii) installation of wastewater treatment system and (iv) all associated site works
Construction of dwelling house, installation of waste water treatment system and all associated site works
Construction of dwelling house, installation of waste water treatment system and all associated site works
The brief summarizes the pattern across all 179 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 23/749The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief