Applications tied to the site
Partial coverage15 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
15 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
9% of nearby decided applications were refused. The site check found 304 decisions within 5 km, 15 exact-site or onsite candidate records, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
15 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
15 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Permission for retention of a pre school opening hours 09.00am to 1.30pm contained within Abbeystrewry Church Hall and for permission for extension of opening hours until 2.15 pm (proposed new opening hours 9.00am to 2.15pm). The proposed development is within the grounds of a protected structure - Abbeystrewry Church, RPS ID:2693
Permission for the change of use of existing bar to bar and restaurant (forming part of a Protected Structure RPS ID: 2,676) including the following: (i) demolition of existing external open enclosure, (ii) construction of new single storey extension for use as kitchen and cold room with adjoining open-topped storage enclosure, (iii) retention of installation of first floor window to western elevation, (iv) enlargement of existing external customer garden / dining area, (v) installation of new retractable awning, fixed awning and reconstruction of garden boundary wall to external customer garden/dining area, (vi) construction of external bar structure serving the customer garden/dining area, and (vii) all associated site works
Demolition and re-construction of front wall of existing building including alteration to the fenestration to premises formerly known as the Plough Bar (Protected Structure).
Permission for the partial change of use and following works to the former ACC Bank building: a) 5 no. apartments in total - 2 bedroom apartment to rear of ground floor & 2 x 2 bedroom apartments and 2 x 1 bedroom apartments to first floor, b) provision of new fire escape stairs to front, c) provision of new fire escape corridor to rear, d) new roofs provided over entire building to suit existing structure, e) facade alterations to front and rear to suit new internal layouts and f) all associated works
Permission for construction of an extension to link the existing ground floor retail area to an existing storage building at the rear including a new flat roof and elevational changes to the storage building. Permission is also sought for change of use of part of ground floor from toilet and storage area to retail use. All located to the rear of premises formerly known as The Plough Bar (Protected Structure)
A) Demolition of existing storage building, b) construction of extension incorporating ground floor store and first floor apartment, c) alterations to toilet area of existing ground floor premises
The brief summarizes the pattern across all 304 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 24/122The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief