Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
6% of nearby decided applications were refused. The site check found 229 decisions within 5 km, 1 exact-site or onsite candidate record, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Construction of a new detached dwelling house, detached garage and all associated site works
The Change of Use of 1 no. classroom to a pre-school along with all associated site works
For the following: (a) Remove existing prefabricated building containing corridor, staffroom and remedial classroom, (b) Demolish existing toilets and store in the main building, (c) Demolish existing detached store and (d) Construct a single storey extension comprising of a classroom and toilets along with all associated site works
Construction of a domestic garage along with all associated site works
Demolition of an existing derelict farmhouse and attached outbuildings, and for the construction of a new detached dwelling house, septic tank and percolation area, and all associated site works
Construction of dwelling house, installation of wastewater treatment system and associated site works
The brief summarizes the pattern across all 229 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 24/151The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.