Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
10% of nearby decided applications were refused. The site check found 310 decisions within 5 km, 2 exact-site or onsite candidate records, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Construction of dwelling house with attached garage, installation of waste water treatment system and for all associated site works
Construction of dwelling house, installation of waste water treatment system and for all associated site works
Construction of dwelling house, detached domestic garage, installation of waste water treatment system and for alterations to existing agricultural entrance and for new entrance and access road for said proposed dwelling and for all associated site works
Construction of a dwelling house and all associated site works
Planning Permission for the following: (i) To construct 3 no. bonded warehouses (ii) to construct a Fire Pump Building (iii) Installation of a Fire Fighting Tank and Construction of a Firewater Retention / Attenuation Pond (iv) Construction of a new internal roadway (v) New site boundaries with security fencing along with all associated site works
Permission for retention of (a) site cabin 1 (constructed to replace the existing site office as permitted under Pl Reg. 99/7165, (b) machinery shed, (c) store cabin 2, (d) site cabin 3, (e) store cabin 4, (f) permission for retention of existing sign at entrance and permission for retention and for continued use of the buildings for site office and storage of materials, machinery and plant for plant hire and general building and all associated site works
The brief summarizes the pattern across all 310 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 24/293The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief