Applications tied to the site
Partial coverage12 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
12 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
4% of nearby decided applications were refused. The site check found 433 decisions within 5 km, 12 exact-site or onsite candidate records, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
12 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
12 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Permission to: a) decommission existing septic tank and percolation area serving existing dwelling house and install a new wastewater treatment unit and polishing filter and b) construct a new vehicular entrance to serve existing dwelling house.
Permission to construct a new dwelling house.
Construction of a new single storey detached dwelling and associated single storey detached garage, a new wastewater treatment unit and percolation area, a new site entrance, and including all associated site works and associated landscaping.
Permission for the redevelopment of an existing ruinous dwelling to include the construction of single storey extensions to the front, rear and side, elevational changes and internal alterations. Retention of existing mobile home, decommission existing septic tank, install new waste water treatment unit and all ancillary site works.
To erect an extension to the side and rear of their cottage, to modify the existing front elevation of the cottage, to upgrade the existing sewage treatment system on site, to re-construct the front boundary wall and vehicular entrance, together with all associated site development works
Permission for the construction of a new detached part two storey, part single storey dwelling house, the installation of a waste water treatment system and percolation area, new vehicular entrance, provision of a new agricultural entrance and all associated site works
The brief summarizes the pattern across all 433 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 24/4124The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief