Applications tied to the site
Partial coverage3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
8% of nearby decided applications were refused. The site check found 177 decisions within 5 km, 3 exact-site or onsite candidate records, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Permission for retention for the following works: 1) As constructed extension to dwelling changed from that previously permitted to include increased height and additional attic accommodation internal and external alterations and boiler room, 2) Change of use of shed, currently being used as lodge for accommodation ancillary to main dwelling, 3) Domestic shed and 4) Alterations to site entrance.
Permission for retention for the construction of a single storey extension to the side of an existing two storey dwelling and all associated site works.
Construction of a 2-storey extension at the gable end of existing dwellinghouse, removal of existing portico and construction of a 2-storey extension in its place at the front of the house
4 individual detached houses on separate sites with each site served with its own treatment unit and percolation area, a new entrance roadway, turning area, street lighting, connection to public water supply and all ancillary works.
For the importation of clean and inert soil & stone for the raising of an agricultural field in order to improve the agricultural output of the field, including the forming of an artificial pond/ wetland area, the construction of a new temporary haul road and a site entrance as well as all other necessary enabling works
The importation of soil and stone for the raising of an agricultural field in order to improve the agricultural output of the field and new entrance.
The brief summarizes the pattern across all 177 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 24/4177The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief