Applications tied to the site
Partial coverage15 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
15 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
9% of nearby decided applications were refused. The site check found 305 decisions within 5 km, 15 exact-site or onsite candidate records, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
15 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
15 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
The construction of 2 no. single storey semi-detached dwellings with terrace above rear part of houses, alterations to rear concrete wall to reduce down to 4.6m in height, SUDS, landscaping and all ancillary site and other works
Construct a new dwellinghouse and undertake all associated site works
1) The change of use and the renovation and alteration of the former convent chapel, a protected structure (RPS 085) for use as commercial facilities (Accommodation to include, Multipurpose room, 'hot desks', the installation of first floor office pods and ancillary facilities) and a community room; 2) The change of use and the renovation and alteration of the former Mercy convent, a protected structure (RPS 086), for use as 7 no. apartments, 2 no. 1-bedroom, 2 no. 2-bedroom and 3 no. 3-bedroom apartments, community space, management office and ancillary facilities. 3) The demolition of existing single storey glass boiler room abutting south elevation of the former Mercy convent, a protected structure (RPS 086). 4) The change of use and the renovation and alteration of the former Mercy Heights School, a protected structure (RPS 087), from former school to 4 no. office units with ancillary facilities, 5.) The construction of a new 4-storey apartment block located to the south-east of the site consisting of 52 no. apartments; 41 no. 2-bedroom and 11 no. 1-bedroom apartments; 6) The construction of 6 no. 2-storey, 2-bedroom terrace houses to the west of the site, adjacent to North Street. 7) The retention of the partially complete 4-level underground carpark (planning reference 06/57052 & 07/57052) and its alteration and completion to provide car-parking facilities and an associated access podium at ground level to the north of the site. Permission is also sought for all ancillary site services including hard standing, lighting, parking, landscaping areas, erection of signage to the northern boundary of site, construction of refuse compound, and connection to public foul sewer and public services
Development of the former St. Fachtna's De La Salle secondary school consisting of: a) Permission for retention of change of use of prefab classroom buildings to office use, b) permission for change of use of the main former school building to commercial office use including alterations to elevations, provision of car parking and all associated site development works, c) permission for retention of alterations to roof including installation of solar panels
Change of use from educational to office space in the main building and for the construction of an extension to the ancillary building to accommodate STEM (Science, Education, Technology and Maths) education, and to carry out alterations and extensions to the former main educational building and ancillary building that will include (i) the erection of a covered walkway linking the aforesaid buildings (ii) alterations to the exterior of main and ancillary buildings including external cladding and fenestration (iii) the erection of an extension to the ancillary building (iv) the provision of on-site car parking with five electric charging stations (v) the erection of a covered bicycle shelter (vi) related landscape works including a recreational area and on-site solar panel array (vii) signage and (viii) all associated site works
Change of use from education use to education, innovation and ancillary office use with minor alterations and all associated works
The brief summarizes the pattern across all 305 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 24/43The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief