Applications tied to the site
Partial coverage5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
5 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
6% of nearby decided applications were refused. The site check found 240 decisions within 5 km, 5 exact-site or onsite candidate records, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
5 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
1) Retention of cubicle house as constructed, 2) construction of cubicle house with underground slurry storage tanks and 3) construction of feed storage shed/machinery shed/cattle shed with under ground slurry storage tank and all associated site works.
A) Permission for retention of dwelling to include revised boundaries, entrance and site layout including septic tank, all as constructed, and b) Permission for decommissioning of existing septic tank and soakpit and construction of new septic tank and percolation area.
Construction of a dwellinghouse
1)Demolitions to an existing dwelling, 2)construction of extension to rear of existing dwelling, 3)alterations to existing dwelling, 4)alterations to existing vehicular entrance, 5) decommissioning of existing septic tank and installation of a new septic tank and percolation area and all associated site works
10 year Planning Permission for a Grid Stability Service Development including the provision of a synchronous condenser enclosed within a building up to 12.5 metres in height with associated plant and apparatus, transformers, circuit breakers, modular electrical control containers, air compressor, cooling equipment, underground cabling (including 110kV connection to the nearby Clashavoon substation), lightning protection masts, perimeter security fencing, drainage infrastructure, landscaping, temporary construction compound, access tracks (new and upgrade of existing), upgrade of existing entrance off the L7477 local road and all ancillary site development works.
Permission for a) demolition of existing open slurry tank & b) slatted cattle shed (with underground tanks) and ancillary site works.
The brief summarizes the pattern across all 240 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 24/4338The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief