Applications tied to the site
Partial coverage7 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
7 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
10% of nearby decided applications were refused. The site check found 729 decisions within 5 km, 7 exact-site or onsite candidate records, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
7 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
7 matched1 of 2 layers are loaded for Cork County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matched2 current citations from the Cork County Council development plan, each with section, page and source URL.
2 matched3 of 4 layers are loaded for Cork County Council and were intersected with the site; flood is not loaded and no conclusion is drawn for it.
3 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Citations are current-dated and carry policy name, section, page and source URL from the Cork County Council development plan.
2 matchedOpen preview
Open preview
Permission for construction of a single storey split-level dwelling house with wastewater treatment unit/soil polishing filter, detached single storey stable building containing 3 no. loose boxes, ancillary outhouse and trailer port private use, minor alterations to existing vehicular entrance, and all ancillary site works including access to public road through new right of way
Construction of single storey split-level dwelling house with wastewater treatment unit/soil polishing filter, detached single storey stable building containing 3 no. loose boxes, ancillary outhouse and trailer port for private use, minor alterations to existing vehicular entrance, and all ancillary site works including access to public road through new right of way. Extension of Duration to Permission granted under Planning Ref. No. 18/6101
Construction of single storey split-level dwelling house with wastewater treatment unit/soil polishing filter, detached single storey stable building containing 3 no. loose boxes, ancillary outhouse and trailer port for private use, minor alterations to existing vehicular entrance, and all ancillary site works including access to public road through new right of way.
Permission for 1) Alterations & extensions to an existing dwelling including single storey extensions to the north-eastern & south-western sides & alterations to openings on the existing north-eastern (side) & north-western (rear) elevations, 2) The erection of a domestic use metal shed on the site to the south-west of the dwelling & 3) All other associated site works.
Retention of alterations to residential site boundary and site area, along with retention of conservatory to rear of existing dwelling and detached shed to rear of site
Construction of domestic garage and alterations and extension to the existing dwelling - Extension of duration of permission granted under Planning Reference: 16/06151.
The brief summarizes the pattern across all 729 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 24/4476The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief