Applications tied to the site
Partial coverage7 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
7 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
10% of nearby decided applications were refused. The site check found 208 decisions within 5 km, 7 exact-site or onsite candidate records, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
7 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
7 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
New single storey flat roof extension to front and internal alterations to existing dwellinghouse
Alterations to existing boathouse including the relocation of the entrance and raising of the level of the roof
To construct a dwelling house and a domestic garage, to install a proprietary sewerage treatment system and undertake all associated site works
To demolish an existing ruined dwellinghouse and construct a new dwellinghouse and a new waste water treatment system and all associated works
Construction of 1. an office and gear changing rooms connected to 2. a gear drying storeroom with 3. a pergola type shelter porch, 4. boat house for storage of kayaks 5. a Kayak akd pedestrian access to Reen Pier and 6. a two vehicle turning bay from road above together with associated site development works
To extend the existing dwelling house to include: A) one-and-a-half storey extension to the south-west facing elevation and construction of a 22.5 m2 (total floor space) on one-and-a-half storey extension, B) one storey extension to the north-east elevation and construction of a 6 m" (total floor space) on a one storey extension, D) one-and-a-half storey extension to the rear of the existing dwelling house and construction of a 130 m2 (total floor space) on one-and-a-half storey extension, and E) all ancillary works.
The brief summarizes the pattern across all 208 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 24/479The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief