Applications tied to the site
Partial coverage7 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
7 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
9% of nearby decided applications were refused. The site check found 734 decisions within 5 km, 7 exact-site or onsite candidate records, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
7 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
7 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Permission for retention of a permanent hard-core surfaced yard and entrance ramp for the purpose of commercial storage of articulated truck trailers. Permission to erect a new 2.4m high palisade fence to the northern and eastern perimeter and part of the western perimeter of the site and new 10m wide sliding entrance gate, and all associated site works at our existing facility
Permission for retention of a hard surface area and entrance ramp for the storage of articulated truck trailers, and permission to erect a new palisade fence to the north, east and part of the western perimeter of the site and a new sliding entrance gate, and all associated site works
Development of 1 no. single storey CNG (compressed natural gas) compressor installation with a floor area of 25m2, 1 no. single storey ESB MV substation with a floor area of 33m2, 1.8m & 2.4m high fence, 3m & 8m high lighting, 2no. storage bases, public access fuelling dispensers and forecourt, fuel totem, access to existing private road and associated ground works.
Permission for construction of a single storey extension to the existing industrial premises.
Dwelling, new entrance and ancillary site works. Extension of Duration of Permission granted under Planning Reference: 14/4187.
The construction of, at our existing facility in the townlands of Anngrove and Killacloyne, Carrigtwohill, co. Cork, a new warehouse (5,176m2) which incorporates a 3 storey area over the loading bays, a two storey connection corridor to the existing building (970m2), a site security building (110m2), a logistic yard, a contractor compound, an extension to the existing staff carpark and an access road on the western boundary of the existing site. Works will include required alterations to the existing internal layout, all necessary demolitions and modifications as well as all associated site development works, including a new surface water connection to the existing industrial estate infrastructure, internal roads, retaining structures, plant areas, pedestrian foot paths, modifications to the site boundary frnce line and new vehicular access barriers
The brief summarizes the pattern across all 734 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 24/4913The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief