Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
11% of nearby decided applications were refused. The site check found 305 decisions within 5 km, 2 exact-site or onsite candidate records, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Permission for the demolition of an existing ESB substation and the construction of a storage shed for the storage of asphalt sand to serve tarmacadam plants in the region, the construction of a 1,500mm high retaining wall, the construction of 1 no. ESB substation, and all associated ancillary development works.
The continued use of the existing plant within the quarry, demolition of existing shed and construction of new shed for vehicle maintenance and storage.
A ten-year permission for the continued use of an existing sand and gravel quarry with 2 no. new extraction areas measuring approximately 3.32ha combined and all associated ancillary development works including the implementation of a phased restoration programme.
A twenty-year permission for the importation and recycling of up to 80,000 tonnes of construction and demolition (C&D) material per annum, including the construction of a new shed to manage/recycle the C&D material; and permission for the importation of up to 200,000 tonnes per annum of imported inert material (consisting of mainly soil/subsoil and stone) and the restoration/infilling of an existing quarry to provide agricultural/biodiversity uses, and all associated ancillary development works including tree planting and the provision of 4 no. bird/wildlife observation hides. The proposed development will utilise the existing quarry infrastructure including internal roads, site office, machinery shed, weighbridge, staff canteen and welfare facilities. An Environmental Impact Assessment Report (EIAR) will be submitted to the planning authority with the application. The application relates to development which comprises an activity requiring a waste licence (which has been provided by the Environmental Protection Agency under Licence Register No. W0255-02).
1) Permission for Retention of alterations and extension to the side of existing dwelling. 2) Permission for the construction of a new extension to the side of existing dwelling. 3) Permission to replace existing septic tank serving existing dwelling and replacing same with a new waste water treatment unit and soil polishing filter and all associated site works and services.
To construct a dwellinghouse
The brief summarizes the pattern across all 305 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 24/4920The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief