Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
10% of nearby decided applications were refused. The site check found 213 decisions within 5 km, 1 exact-site or onsite candidate record, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
A 10 Year planning permission for a solar farm with a total area of circa 179 hectares. The solar farm will consist of solar panels on ground mounted frames, 25no. single storey electrical inverter/transformer stations, 3 no. single storey spare parts containers, 3 no. Ring Main Units, 7 no. weather stations, underground electrical ducting and cabling within the development site, private lands and within the L7691 and L7692 public roads to connect solar farm field parcels, security fencing, CCTV, access tracks, 7 no. stream/drain deck crossings, temporary construction compounds, landscaping and all associated ancillary development and drainage works. Construction and operational access will be 4 no. entrances from the R626, L7691 and L7692. The operational lifespan of the solar farm will be 40 years and planning permission is requested for this duration. A Natura Impact Statement (NIS) has been prepared and will be submitted to the planning authority with the application.
Permission to construct a straw bedded cattle shed with slatted tanks and ancillary works
To construct a Straw Bedded Cattle Shed with Slatted Tank and ancillary works.
Construct a dwelling house, new vehicular entrance, domestic garage, install a new wastewater treatment system and all associated site works.
Retention of single storey extension to side of dwelling, raising flat roof of porch to a pitched roof, alterations to dwelling externally including new sliding doors replacing windows to front, a window replacing a door to rear, internal alterations and all associated site works
To construct a straw bedded cattle shed with slatted tank and ancillary works.
The brief summarizes the pattern across all 213 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 24/5630The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief