Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
6% of nearby decided applications were refused. The site check found 201 decisions within 5 km, 2 exact-site or onsite candidate records, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Permission for raising ground levels with inert soil and stone to improve the agricultural potential of the field. It is proposed to import and recover inert soil and stone under permit and/or as a by-product under article 27. It will include upgrade of existing field entrance, construction of temporary haul roads installation of surface water management measures, site signage and wheel wash for the duration of the works, and all ancillary site works.
Upgrading and relocation of existing septic tank serving dwellinghouse to proprietary treatment system.
Permission for Retention of the following as-built extensions and storage areas to existing restaurant/bar premises; glazed dining room extension, 3 no. detached external dining rooms (including gazebo), keg storage, bottle storage, cold storage, kitchen and food preparation area, smoking area, storage sheds, office and existing signage. Permission for 24 no. new car parking spaces with new entrance, retaining wall, pedestrian crossing, new pumping station, proprietary treatment unit and polishing filter with separate proposed new entrance to same, decommissioning of existing wastewater treatment system, together with all other ancillary site works.
Construct dwelling and detached garage and all associated site works.
To construct new single storey agricultural shed with storage/workshop space, site entrance and all associated site works.
Proposed works: 1) demolition of existing external access ramp and external stairs; 2) construction of new two-storey extension to side of existing school to accommodate ASD unit: lower ground floor accommodation to consist of ancillary accommodation room, storage room and SET room; upper ground floor accommodation to consist of 2 no. ASD classrooms with ancillary accommodation and sanitary facilities, para educational room, multi-sensory room and internal staircase and lift; 3) minor alteration to existing elevations and floor plans, to include alterations to the existing main entrance lobby; 4) alteration to front road boundary to include the partial demolition of existing front boundary wall and gated access, and the construction of new boundary wall to be set back from road edge and construction of new pedestrian gated site access; 5) planning permission for retention and relocation on site of existing ancillary storage shed; 6) construction of new external access ramp and stairs; 7) works to upgrade the existing waste water treatment system and percolation area on site and; 8) all ancillary site works.
The brief summarizes the pattern across all 201 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 24/5923The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief