Applications tied to the site
Partial coverage5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
5 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
9% of nearby decided applications were refused. The site check found 592 decisions within 5 km, 5 exact-site or onsite candidate records, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
5 matched1 of 2 layers are loaded for Cork County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matched2 current citations from the Cork County Council development plan, each with section, page and source URL.
2 matched3 of 4 layers are loaded for Cork County Council and were intersected with the site; flood is not loaded and no conclusion is drawn for it.
3 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Citations are current-dated and carry policy name, section, page and source URL from the Cork County Council development plan.
2 matchedOpen preview
Open preview
Permission to retain the following developments: 1) Removal of chimney on southern gable, 2) Installation of new window and 3) Replacement of double door with a new window, both on the southern gable. Permission for the following proposed developments: 1) Erection of a new porch to northern elevation, 2) Erection of a lean-to open-sided shelter structure to rear eastern elevation and 3) Installation of a double door to replace existing window from the kitchen on eastern elevation. The above developments are to an existing dwelling house.
To demolish extension to existing dwelling along with existing disused out-offices and to re-model said existing dwelling and construct new single-storey extension on to same and to construct detached garage and store with new site entrance walls as well as domestic effluent treatment plant and all associated site development works
To alter and extend existing single storey dwellinghouse, Works to include; 1. Re-roofing of existing structures and re-construction of defective masonry walls, together with altered internal subdivision walls 2. Installation of new windows and external doors to original dwelling, 3 construction of new extension and installation of domestic effluent treatment plant and all site development works.
Single storey rear extension as constructed to dwelling house and all associated site works.
Permission for the construction of extensions to existing dwelling house, alterations to existing elevations and all associated site works
To demolish rear dwelling extension, derelict outbuildings at the side/rear and to remove the side garden wall, to alter the existing front part of dwelling house (cottage) and to construct a new single storey extension to the rear of dwelling house to provide living accommodation; to remove front fence wall and to construct a new site entrance gate and wall fence and new waste water treatment system and all associated site development works.
The brief summarizes the pattern across all 592 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 24/6180The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief