Applications tied to the site
Partial coverage3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
12% of nearby decided applications were refused. The site check found 411 decisions within 5 km, 3 exact-site or onsite candidate records, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Retention Permission for the construction of a ground floor extension at the side of the existing dwelling and the installation of 1no. roof light in the south east elevation and all associated site works.
The construction of a new dwelling house, installation of a bored well, wastewater treatment system and percolation area, creation of a new site entrance and all associated site works.
Permission for the construction of a new single storey detached dwelling house and detached domestic garage, the installation of a bored well, wastewater treatment system and percolation area, creation of anew site entrance from a public road and all associated site works.
A ten year planning permission for an energy storage facility comprising; 1) energy storage containers installed on concrete plinths; 2) electrical inverters and transformers; 3) underground electrical and communications cabling; 4) the upgrade of an existing agricultural access point from the L6989; 5 ) on-site access track; 6) security fencing and security gates; 7) pole-mounted security cameras; 8) all associated and ancillary site development, landscaping and reinstatement works. The operational lifetime of the proposed development is 35-years. This planning application is accompanied by an Appropriate Assessment Screening report.
Retention of the existing extensions to the original dwellinghouse including the attached existing boiler house and retention of the existing garage building located within the curtilage of the site. Permission for site works to include the decommissioning of the existing septic tank and the installation of new waste water treatment system
To construct 2-storey dwellinghouse with detached domestic garage, new waste water treatment unit and polishing filter, site entrance and all associated site works.
The brief summarizes the pattern across all 411 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 24/6364The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief