Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
7% of nearby decided applications were refused. The site check found 195 decisions within 5 km, 2 exact-site or onsite candidate records, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Construction of a single storey extension to the existing dwelling and all ancillary site works
Construct a cattle house with two no. slatted slurry tanks; construct a concrete cow path, slatted soiled water tank and concrete approach ramp to existing cattle underpass; construct a milk silo with annex and ladder cage and carry out all associated site works
Demolition of existing rear extension and permission to construct a new extension to the rear of existing dwelling and permission to replace existing septic tank system with a treatment plant and percolation area
Construction of an extension onto existing dwelling with associated site works
Construction of a dwelling and domestic garage
To consist of a new bay which will comprise of a cable chair, a circuit breaker, a voltage transformer, a current transformer and a conductor that transfers electricity between them and onto the existing busbar and a 15m high lightning nonopole. The proposed bay has an approximate footprint of 408m2 (34m x 12m) and is 7m in height. An underground cable within the ESB compound of approximately 150m in length also forms part of the proposed development. The area within the red line application boundary is 0.1078ha
The brief summarizes the pattern across all 195 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 24/95The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief