Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
9% of nearby decided applications were refused. The site check found 43 decisions within 5 km, 1 exact-site or onsite candidate record, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Permission for the following works to existing dwelling house: - (A) Demolition of a ruinous rear single storey attached storage shed. (B) For alterations and for part single storey and two storey extensions to dwelling to include roof lights to roof of existing dwelling.(C) For upgrade of existing vehicular access road to serve said dwelling. (D) For new waste water treatment system to serve dwelling and for all associated site works
Construction of two-storey split-level dwelling, installation of wastewater treatment system and all associated site works
Permission for the following: 1. Retention of: (a) refurbishment works to existing disused fire-damaged dwelling house including reconstruction of roof similar to original, installation of windows and doors and installation of first floor, (b) enlargement of original site entrance from public road and creation of vehicle parking area, (c) detached domestic garden store, and 2. Permission for: (a) completion of works to dwelling house, (b) extension to dwelling house, (c) installation of wastewater treatment system and (d) all associated site works
Permission for (i) retention of site preparation works, to include upgrading of agricultural entrance, access road, site excavation, and (ii) permission for construction of detached shed/garage for storage of vintage agricultural machinery and (iii) all associated site works
Permission for (i) Change of use of existing Adrigole Health Centre to a single-residential unit; (ii) alterations to existing elevations' (iii) alteration to existing vehicular entrance; (iv) permission for upgrade of existing septic tank to waste water treatment system, percolation area and all associated site works
Permission for Retention of amendments to caretaker's dwelling to include: Alterations to elevations and fenestration, revised location of dwelling and of wastewater treatment system serving same and for revised site boudaries. Permission also sought for retention of construction of plant house/domestic workshop in lieu of garage and for revised location of same. Permission also sought for retention of 2 no. temporary 20ft storage containers for a period of two years. Permission also sought for modifications to caretaker's dwelling to include: Change of use of same to accommodation for use in small scale rural enterprise, alterations to fenestration and erection of 22m2 solar panels to roof
The brief summarizes the pattern across all 43 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 25/141The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief