Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
31% of nearby decided applications were refused. The site check found 26 decisions within 5 km, 1 exact-site or onsite candidate record, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Erection of eight wind turbines with an overall ground to blade tip height of 175m consisting of a rotor diameter of 150m; and a hub height of 100m, Construction of permanent Turbine hardstands and Turbine Foundations, Construction of one temporary Construction Compound with associated temporary site offices parking areas and security fencing, Installation of meteorological mast with a height of 100m, Development of one on-site Borrow pit, Construction of new permanent internal site access roads and upgrade of existing internal site access roads to include passing bays and all associated drainage infrastructure, Development of a permanent internal site drainage network and sediment control systems, All associated underground electrical power and communications cabling connecting the wind turbines to the on-site substation, Biodiversity enhancement measures. Recreational community improvements including the erection of 4 no. permanent information boards relating to cultural heritage and upgrades to amenity tracks across the site, all associated site development works
To construct dwelling and all associated site works
Permission for facilitating works for the provision of access to existing hill-walking routes at Shehy Mountain as follows: (i) construction of parking area for bicycles, cars and small buses at Shehy Beg, Dunmanway, Co. Cork, (ii) installation of 5 no. road signs along public roads in Glanycarney, Dunmanway, Co. Cork. (iii) installation of 1 no. road sign along public road at Derragh, Dunmanway, Co. Cork and (iv) ancillary site works at Shehy Beg, Dunmanway, Co. Cork
Permission for retention of minor alterations to fenestrations of existing dwelling from that granted in planning ref. no. 06/1858 and all associated site works
Changes to the layout and elevation plans of the dwelling granted under planning reference 16/720. The changes will include a storey and a half extension to the rear instead of the single storey extensions permitted and alterations to the layout of the windows. All other works will be in accordance with permission 16/720 which included the partial demolition and rebuilding of an existing extension, alterations to elevations of the existing cottage, an extension to the side of the cottage and creation of a new vehicular entrance, and all associated site works at Cornery Inchigeela, Co. Cork
Construction of a dwelling house, effluent treatment system and associated site works
The brief summarizes the pattern across all 26 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 25/142The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief