Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
11% of nearby decided applications were refused. The site check found 188 decisions within 5 km, 1 exact-site or onsite candidate record, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Construction of new dwellinghouse and domestic garage, new entrance, wastewater treatment system together with all other ancillary site works
Permission for Retention for; A) 2 No. detached structures which comprise of a home gym and home office ancillary to the main dwelling, B) All associated site works.
Permission for retention for; a) 2 no. log cabins which comprise of a granny flat and living accommodation ancillary to the main dwelling, b) all associated site works
Permission for the construction of a two-storey dwelling house, the construction of a detached domestic garage with first floor storage space, the construction of a site entrance, the installation of a private well, the installation of a septic tank and associated soil percolation area and all ancillary works
The construction of cow housing with slatted tanks and all associated site works.
The existing Bandon to Dunmanway 110 kV Overhead Line (OHL), which is approximately 26km long between the existing Bandon 110kV Substation in the townland of Mishells, Co. Cork (approximately 1km north of Bandon, Co. Cork) and the existing Dunmanway 110kV Substation in the townland of Ballyhalwick, Co. Cork (approximately 0.4km east of Dunmanway Co. Cork). The existing OHL is located in the townlands of Acres, Aghalinane, Ballyhalwick, Balteenbrack, Behagh, Caher, Carhoon West, Castlelands, Derrycool, Dromidiclogh, Dromidiclogh West, Gortnamucklagh, Gurteen, Gurteenroe, Kilnacranagh East, Kilnacranagh West, Laragh, Lissacroneen, Mallowgaton, Mishells, Murragh, Roughgrove East, Roughgrove West, Sranaviddoge, Teadies Upper, Toom and Tullyglass, Co. Cork. An uprate (refurbishment) of the existing Bandon to Dunmanway 110kv OHL, which consists of the: (i) replacement ("restringing") of the existing OHL conductor wires with a new higher capacity conductor including installation of a new fibre optic communication connection; (ii) replacement of 12 no. of the 13 no. existing steel towers including 11 no. angle masts (AM) and 1 no. end mast (EM) and their foundations with similar structures and member replacement and new bolts at 1 no. EM. Any replacement AMs will be constructed at, or immediately adjacent to the existing structures that they will replace, with a height difference of between 0.5-1.5m; (iii) Replacement of 16 no. of the 127 no. existing intermediate Polesets (IMPs); with similar structures. Any replacement IMPs will be constructed in situ, with the exception of IMP128 which will be replaced at an offset of 10m. The height differences of the replacements will be 1m, with the exception of IMP113 and IMP115 which will be a 2m and 3m increase in height respectively, (iv) Carrying out of civil works for tower foundation strengthening at 1 no. location; (v) Replacement of hardware and fittings at all locations, including insulators, clamps, anti-climb guards, vibration dampers, and installation of new jumper arrangements, suspension weights, plump poles, pole bolts and anti-climb guards; (vi) replacement of a crossarm at 1 no. location; (vii) all associated works within the existing Dunmanway Substation to accommodate the uprated 110 kV OHL and all associated site development works including above and below the ground works to gain access to the existing structures including timber cutting and vegetation clearance, painting, renumbering of replacement st
The brief summarizes the pattern across all 188 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 25/206The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief