Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
4% of nearby decided applications were refused. The site check found 28 decisions within 5 km, 1 exact-site or onsite candidate record, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
The development will consist of the installation of electronic communications comprising a 12-metre high stout wooden pole supporting 2 no. radio-link dishes, together with equipment cabinet, fibre ducting and chambers, foundation and all associated ancillary development works. The development is required to carry the broadband data from the new high speed fibre broadband network on the island, to the mainland by radio link, to connect to the NBI national fibre network, as part of the government's national broadband plan to provide high speed broadband to all parts of the country that are not available commerically including the islands, at the same data speed
Permission for: (i) retention of dwelling house (previous planning ref's 05/4171 and 06/423), (ii) retention of and change of use of detached ancillary dwelling to a studio / store ancillary in use to the dwelling house and (iii) retention of detached garden shed
Chun foirgnimh reamhdhéanta a sholáthar le haighaidh ceard-tionscail bheaga iasc deataithe, comh maith le oibreacha cuideachta láithreán
Development will consist of: the provision of an integrated whiskey distillery and associated development (with ancillary waste water treatment facilities) comprising: mash house/tun room (171 sqm); fermentation building (236 sq m): stills building and decanting area (298sq m); visitor's centre shop and staff acilities (134sq m); glazed link area (16sq m) and ask stores (745 sq m), all ranging from one to three storeys in height. The development will also consist of the provision of ancillary plant areas including wastewater treatment plant enclosures and associated pipework; percolation areas; storage areas including water tank and grain silos; ancillary staff and visitor areas; landscaping and boundary treatmets; lighting; changes in level and all ancillary site development and excavation works above and below ground
Replacement of an existing 15m high disused wind turbine for an 18m high free standing communications structure with its associated antennae, communication dishes, ground equipment, wooden fencing and associated site development works. The development will form part of an existing telecommunications and broadband network
To demolish an existing outhouse, to carry out alterations and construct an extension to an existing dwellinghouse, to install a proprietary waste water system and percolation area and to carry out all associated works
The brief summarizes the pattern across all 28 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 25/229The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief