Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
9% of nearby decided applications were refused. The site check found 70 decisions within 5 km, 1 exact-site or onsite candidate record, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Construction for an emergency response store and all associated site works
Replace the existing septic tank serving the Control Room with a new advanced treatment system and polishing filter
Permission for alterations to the roof structure of existing tank no. 207, comprising the demolition and removal of the existing flat external floating roof and the construction of a new fixed domed roof with internal floating roof system, including the provision of fixed access stairs and handrail from top of the existing tank to top of the proposed domed roof and all other associated ancillary site works. The proposed development is for modifications to an establishment to which the Major Accident Directive applies. The proposed development is for the purpose of an activity requiring an Integrated Pollution Prevention and Control Licence
Completion of alterations/extension works to an existing dwelling house including alterations to elevations. Permission is also sought for the following works to a detached ruinous building and for change of use of same to a dwelling for use ancillary to the main dwelling, works to include alterations / extension to same including raising of roof. Permission also sought for the upgrade of an existing entrance and parking area, waste water treatment system to serve both the existing dwelling and the proposed ancillary dwelling and for all associated site works
Demolition of existing house and construction of a new dwelling house, new wastewater treatment system and all associated site works
Construction of a shed for use to store equipment relating to the harvesting of mussels and for creation of a new entrance from the public road and all associated site works, and seek permission for retention of an existing shed as built on site which is used for the storage of equipment relating to the harvesting of mussels
The brief summarizes the pattern across all 70 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 25/264The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief