Applications tied to the site
Partial coverage20 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
20 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
8% of nearby decided applications were refused. The site check found 132 decisions within 5 km, 20 exact-site or onsite candidate records, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
20 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
20 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
(a) Permission for retention and completion of reconstruction and change of use to commercial storage of previous agricultural buildings adjacent to the production facility at Glenilen Farm. (b) For retention of adjacent plant room, store and milk silo. (c) Permission is also sought for change of use of existing slatted house to plant room. (d) Permission for demolition of existing milk processing facility. (e) Permission for ESB substation building along with all associated site development works
200 photovoltaic panels on the roof of the existing building with all associated site works
Erect 375.00 m2 of PV Solar Panels on the roof of existing building in Glenilen Farm, with all associated site works
Permission for (a) retention and upgrade of fire fighting lagoon, proposed works to include surface water soak pits (b) retention and upgrade of wastewater treatment system along with all associated site development works to serve the production facility/ farm.
To build agricultural storage building and all associated site works
Construct extension to an existing agricultural storage building and all associated site works
The brief summarizes the pattern across all 132 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 25/287The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief