Applications tied to the site
Partial coverage5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
5 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
5% of nearby decided applications were refused. The site check found 732 decisions within 5 km, 5 exact-site or onsite candidate records, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
5 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
A service station development and new access road to the existing industrial complex (Phases 1 & 2 of a 3-phase masterplan development of subject lands). The proposed development includes (1) Phase 1 – provision of new access road to service existing industrial estates and relocation of existing ESB substation; (2) Phase 2 – construction of new two-storey forecourt building with 100sq.m retail shop, 76.51sq.m restaurant food prep area with 5.35sq.m drive-thru facility, 30.28sq.m deli food prep area, 112.26sq.m seating area including 7.32sq.m barista unit, plus offices, stores & toilet facilities at ground and first floor levels; (3) construction of forecourt layout including 4no. fuel pumps and canopy over to service cars and LCV’s, separated 1no. hi-speed fuel pump and canopy over to service HGV’s (with dedicated access lane) and 4 no. underground fuel storage tanks, (4) sale of specially prepared hot & cold food for consumption both on and off the premises from the restaurant/drive thru/deli food areas of forecourt building; (5) ancillary signage for development, both illuminated and non-illuminated; (6) all associated site works including bin compound and (7) boundary adjustments to tie in with council proposed services corridor link road. Phase 3 of the masterplan development will be subject of a separate planning application. Extension of Duration to Permission granted under Planning Ref. No. 19/5870
A service station development and new access road to the existing industrial complex (Phases 1 & 2 of a 3-phase masterplan development of subject lands). The proposed development includes (1) Phase 1 – provision of new access road to service existing industrial estates and relocation of existing ESB substation; (2) Phase 2 – construction of new two-storey forecourt building with 100sq.m retail shop, 76.51sq.m restaurant food prep area with 5.35sq.m drive-thru facility, 30.28sq.m deli food prep area, 112.26sq.m seating area including 7.32sq.m barista unit, plus offices, stores & toilet facilities at ground and first floor levels; (3) construction of forecourt layout including 4no. fuel pumps and canopy over to service cars and LCV’s, separated 1no. hi-speed fuel pump and canopy over to service HGV’s (with dedicated access lane) and 4 no. underground fuel storage tanks, (4) sale of specially prepared hot & cold food for consumption both on and off the premises from the restaurant/drive thru/deli food areas of forecourt building; (5) ancillary signage for development, both illuminated and non-illuminated; (6) all associated site works including bin compound and (7) boundary adjustments to tie in with council proposed services corridor link road. Phase 3 of the masterplan development will be subject of a separate planning application.
Permission for carwash facility comprising of 1) automatic rollover carwash unit complete with side-screens, 2) pressure-jet carwash facility with enclosure building over, 3) 10,000-litre underground water storage tank, 4) carwash pump room for water-treatment facilities, water pumps and compressor unit, at service station complex previously approved under planning files ref. no's 19/5870 and 25/4142
Relocation of existing entrance on Knockgriffin Industrial Estate road to new industrial estate access road, forming the western arm of roundabout R1 on the northern relief road
Permission for: a) conversion of part of store on north side of site to changing room facilities/drying room at ground floor with offices, toilets and tea room at first floor and elevation changes, b) proposed single storey extension on eastern side of site for new plant room and c) demolition of existing single storey detached office building on north eastern corner of site and all associated site works at their premises.
Installation of 1.7 mega watts (12.810sq.m) of roof mounted solar pv panels to be mounted on both the pitched roof of the permitted (Reg No. 18/6790) but not yet constructed cold store extension and flat roof of the existing cold storage building together with a handrail surrounding the flat roof area and all associated ancillary works
The brief summarizes the pattern across all 732 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 25/4142The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief