Applications tied to the site
Partial coverage12 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
12 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
9% of nearby decided applications were refused. The site check found 90 decisions within 5 km, 12 exact-site or onsite candidate records, and 2 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
12 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
12 matched1 of 2 layers are loaded for Cork County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matched2 current citations from the Cork County Council development plan, each with section, page and source URL.
2 matched3 of 4 layers are loaded for Cork County Council and were intersected with the site; flood is not loaded and no conclusion is drawn for it.
3 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
2 structured nearby appeal records.
2 matchedCitations are current-dated and carry policy name, section, page and source URL from the Cork County Council development plan.
2 matchedOpen preview
Open preview
Permission for an upgrade of the Ballydesmond wastewater treatment plant and will generally comprise of the following; to construct a new forward feed pumping station, construct a new inlet works, construct new combined aeration and stormwater tanks with associated access stairs and platform, construct a new final settlement tank, construct a new ferric dosing system, construct new sodium hydroxide dosing system, construct new tertiary disc filters, construct a new polymer dosing system, construct a new supernatant pump station, construct a new potable water booster pump station, construct a new control kiosk and welfare unit, construct a new sludge holding tank, and all associated site development works including hard and soft landscaping, demolition of the existing wastewater treatment plant. A Natura Impact Statement (NIS) has been prepared in respect of the proposed development.
Retention of a single-storey rear extension to a public house, a single-storey rear extension and front lobby extension to an adjoining dwelling house, a rear domestic garage, and all associated site works.
(i) Installation of diesel pump with canopy in car park at rear of existing shop, (ii) overground diesel storage tanks at rear of existing shop, and (iii) signage. Extension of Duration of Permission granted under Planning Reference: 12/05865.
Permission to renovate an existing dwelling, comprising the construction of a two-storey rear extension, minor façade changes to the front elevation, the demolition of a garden shed, and all ancillary site works
Retention of dwellinghouse with basement as constructed and all associated site works within revised boundaries
(A) Retain attic development along with roof light windows to the side and rear of existing dwelling house and (B) retain existing as built domestic garage on site along with all ancillary site works.
The brief summarizes the pattern across all 90 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 25/4302The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief