Applications tied to the site
Partial coverage5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
5 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
13% of nearby decided applications were refused. The site check found 193 decisions within 5 km, 5 exact-site or onsite candidate records, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
5 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Permission for the construction of agricultural building to include cubicle & straw bedded livestock housing, slatted slurry storage tanks and soiled water/parlour washings tank along with associated site works
Permission for the following: (a) Demolition of milking parlour, (b) Construction of agricultural building to include milking parlour, livestock handling facilities, ancillary rooms along with unroofed collecting yards and slatted slurry tank and slatted soiled water/parlour washings tank, (c) Erection of meal bin and water storage tank, along with associated site works
Construction of dwellinghouse, detached domestic garage, sewerage treatment system and all associated site works.
Permission for of a domestic garage and permission for the construction of a dwelling house and a new vehicular entrance, installation of a domestic wastewater treatment system and all associated site works.
Construction of dwellinghouse, domestic garage, new entrance, septic tank and percolation area together with all other site works.
Planning permission to construct a dwelling house and domestic garage along with all associated site works
The brief summarizes the pattern across all 193 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 25/4454The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief