Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
12% of nearby decided applications were refused. The site check found 577 decisions within 5 km, 1 exact-site or onsite candidate record, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Permission for the construction of extensions and alterations to an existing dwelling house, including the demolition of an existing extension and garage, the construction of a garage, the installation of a new on-site wastewater system, a new vehicular entrance and all associated site works
Permission for alterations and extensions to dwelling house consisting of a two-storey side extension, ground floor rear extension, elevational changes and associated site works.
Construct a dwellinghouse, a garage for domestic purpose, to install a domestic wastewater treatment system and to carry out all associated site works.
(A) Construction of an agricultural cubicle shed with an underground slatted tank. (B) Construction of a silage slab, (C) Construction of an overground slurry tower and all associated site works.
To construct a detached dwellinghouse, detached garage, vehicle access, wastewater treatment system and site works.
To construct a new dwelling house.
The brief summarizes the pattern across all 577 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 25/4544The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief