Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
11% of nearby decided applications were refused. The site check found 332 decisions within 5 km, 2 exact-site or onsite candidate records, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Permission for extraction of sand & gravel over an area c3.5 ha; extraction by dry working to a level 2 metres above ground water level at a maximum rate of 100,000 tonnes per year; transport of the extracted sand & gravel to the adjacent Dromkeen pit (plan ref. 23/04780) for use in concrete production; upgrading of the existing internal access road and use of the existing access onto the local road L3204; provision of wheelwash and welfare unit (c8.3sqm) and restoration of the lands to agricultural and natural habitat use, all within an application area of c4.0 hectares. Permission is sought for 15 years plus two years for final restoration (total duration of seventeen years). The planning application will be accompanied by an Environmental Impact Assessment Report (EIAR).
1. Construct a new one and a half storey small dwelling house – granny flat. 2. Decommission the existing septic tank that serves the existing dwelling house on site. 3. Install a new waste water treatment system and percolation area which will serve the existing dwelling house and the proposed small dwelling house – granny flat. 4. Carry out all associated site works.
(A) Attic conversion to living area including associated alterations to ground floor and associated elevational alterations, (B) single window in lieu of 2 no. windows to rear elevation at ground floor level, to a dwelling and (c) shed (domestic use).
To retain (A) Attic conversion to living area including associated alterations to ground floor and associated elevational alterations, (B) Single window in lieu of 2 No. windows to rear elevation at ground floor level, to a dwelling and (C) retention of shed (domestic use).
Permission for retention of a) dwelling house, b) detached domestic garage, c) timber garden shed, d) 2 no. containers (domestic use)
Permission for the construction of a dwellinghouse, detached garage, wastewater treatment system and all associated site works.
The brief summarizes the pattern across all 332 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 25/4666The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief