Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
6% of nearby decided applications were refused. The site check found 954 decisions within 5 km, 1 exact-site or onsite candidate record, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Permission for demolition of two bay windows at ground level to south east façade of the existing dwelling and construction of a single storey porch and conservatory to the south east façade of the existing dwelling.
A new vehicular entrance off Church Road (R613) to access the permitted Solar Farm Development (Planning Ref. No. 17/6351) including all ancillary works.
Retention to retain: (A) Ensuite and vanity room to rear of existing dwelling as constructed (B) 3 no. roof lights to rear flat roof and 1 no. window to side of existing dwelling (C) Detached domestic storage building as constructed.
To retain dwellinghouse (change of plan to that granted permission under Planning Reg. No. 06/8847).
A 10 MW solar farm comprising approximately 44,400 photovoltaic panels on ground mounted frames within a site area of 25.8 hectares, 4 no. single storey inverter/transformer stations, 2 no. single storey delivery stations, security fencing, CCTV, and all associated ancillary development works.
A 10 MW solar farm comprising approximately 44,400 photovoltaic panels on ground mounted frames within a site area of 25.8 hectares, 4 no. single storey inverter/transformer stations, 2 no. single storey delivery stations, security fencing, CCTV, and all associated ancillary development works. Extension of Duration to Permission granted under Pl.Reg.No. 17/6351.
The brief summarizes the pattern across all 954 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 25/4846The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief