Applications tied to the site
Partial coverage4 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
4 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
9% of nearby decided applications were refused. The site check found 691 decisions within 5 km, 4 exact-site or onsite candidate records, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
4 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
4 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Permission for the construction of an electrical compound and associated site development works. The proposed electrical compound will include an ESB control building, Merck customer building, 2 no. 38kV transformers and all ancillary bunds, equipment, access roads, lighting and fencing. The proposed development is for a new build on an existing manufacturing establishment site to which the Major Accident Directive applies. The Natura Impact Statement will be submitted to the Planning Authority with the application. The Natura Impact Statement will be available for inspection or purchase at a fee not exceeding the reasonable cost of making a copy during office hours at the offices of the Planning Authority. The establishment holds an Industrial Emissions Licence that is regulated by the Environmental Protection Agency (EPA). Under the proposed development the site will remain in compliance with all regulatory requirements under existing licence condition.
Permission for the construction of a single storey ESB switch room building, single vehicle park space, pedestrian paths and ramps. The proposed development is for a new build on an existing manufacturing establishment site to which the Major Accidents Directive applies. The proposed development site is subject to the provisions of an EPA-Industrial Emissions Directive (IE) Licence
Permission for alterations and revisions to the previously approved planning reference number 22/4839. The proposed changes include a reduction in the size of the T7 building and an expansion of the pump house footprint (total 5.6m2 increase in total floor area). Modifications to the permanent bridge are also proposed, involving adjustments to its external materials and dimensions. Site-wide landscaping updates are planned, along with the installation of high-level signage on the IC4 production building. Minor adjustments to the type, size and placement of doors and windows are proposed for the IC4 production building, central utility building, drum store and foam deluge building. The application also includes the relocation of the southeast gate and detailing of the cycle route. Finally, alterations to plant, machinery, and tanks to the IC4 production building, yard area and fire water tank areas are part of this proposal. The proposed development is located on an existing manufacturing site which the Major Accidents Directive applies. The site is also subject to both an Industrial Emissions License and an Integrated Pollution Control License, regulated by the environmental Protection Agency (EPA). A Natura Impact Statement and Appropriate Assessment Screening Report is submitted to the Planning Authority with this Application.
The Development will consist of a new waste water treatment area. Works will include the construction of a standalone single storey roofed tankage structure, a two-storey dewatering/sludge building, a concrete slab area, access road, 3 no. vehicle parking bays and associated ground level mounted equipment and storage area. This application is for an amendment to the WWT area previously approved under reference no. 22/4839. The proposed development is on an existing manufacturing site to which the Major Accidents Directive applies, and to which an Industrial Emissions Licence and an Integrated Pollution Control Licence that are regulated by the Environmental Protection Agency (EPA) applies.
Permission for retention of an emergency response team modular building, a medical team modular building, an engineering support office modular building, a chemical storage unit, an argon gas store, joining and enclosing of two chemical drum store canopies, a contractor’s smoking shelter, a general smoking shelter, a motorbike and bicycle shelter, a chemical dosing station enclosure, a water analysing cabin, increase height of the stairwell enclosure to the northwest of the K2 production building and enclosure to the stairs on the north east of the K2 production building which are alterations to that granted under planning permission number 18/6189, permanent security building and facilities support building temporarily granted under planning permission 13/4033, production building elevational alterations to that granted under planning permission number 14/4013, machinery parts storage building elevational and layout alterations and additional mezzanine storage area, as constructed, to that granted under planning permission number 15/6112, boiler house elevational and layout alterations and additional mezzanine maintenance area, as constructed, to that granted under planning permission number 13/5232, retention and completion of three IC4 engineering support office modular buildings and link corridor joining the engineering support office to the IC4 engineering support office #1, and all associated site works at the existing facility at Tullagreen and Carrigtohill (townland), Carrigtowhill, Co.Cork, T45 KD29. The proposed development is for modifications to an establishment to which the Major Accidents Directive applies. The establishment holds an Industrial Emissions Licence and is regulated by the Environmental Protection Agency. Under the proposed development the site will remain in compliance with all regulatory requirements under existing licence condition.
The demolition of existing switch room and an existing drum store and the construction of a new 3 storey manufacturing building to the east of the existing manufacturing building. At ground floor level the new manufacturing building will comprise warehouse area with two loading docks, a main production area, changing facilities, entrance area, offices, circulation corridors, workshops and a quality control laboratory. First floor level will comprise laboratory accommodation, offices, meeting rooms, circulation corridors, mechanical and electrical plant rooms. Second floor level will comprise process, mechanical and electrical plantrooms and circulating corridors. Roof level will comprise double stacked air handling units, chillers, miscellaneous mechanical pipework and electrical cable tray on pipe bridge structures traversing the roof. The development will also consist of a new single storey drum storage building & a 2 storey central utilities building accommodating boilers, air compressors and electrical switch rooms. A pipe Rack structure will carry electrical cable tray and pipework between the main production building, the drum store, the central utilities building and a new wastewater treatment plant. External works will comprise: The provision of a new internal road serving the south side of the main production building and along the west side serving the new central utilities building and drum store. The hard-standing area between the drum store and central utilities building to accommodate a process regenerative thermal oxidiser accessible by a service road between CUB and drum store. The provision of a hard-standing area east of the drum store and central utilities building accommodating a replacement switch room, regenerative thermal oxidiser serving the WWTP, a fire water storage tank, a used pallet storage area, a pump house, a foam pump house and an area to locate emergency generators. The height of the existing fire water retention pond is to be increased by 500mm for increased capacity. An extension to the wastewater treatment plant serving the new development will comprise an electrical switch room building, multiple tanks and bunded areas to be located on the east side of the site. Expansion of the existing tank farm will comprise the installation of mechanical equipment and solvent recovery units, serviced by a new tanker loading bay. The provision of a new main electrical switch building adjacent to the existing security cabin. The exis
The brief summarizes the pattern across all 691 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 25/4938The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief